CBC Temporary Road Closure Notification – Edworth Road, Langford

When:
9th November 2021 – 22nd November 2021 all-day
2021-11-09T00:00:00+00:00
2021-11-23T00:00:00+00:00
Reason: Retexturing*
Length affected: from jct with Hill Farm to Roundabout with A1
Date: This road closure will be from 12th October to 25th Oct between the hours of 0800 – 1800hrs.
The restrictions are to be in operation only when the necessary signs are erected on site.
Diversion: Head north-east towards London Rd/A1
At Biggleswade South Roundabout, take the 2nd exit onto A1
At Biggleswade North Roundabout, take the 1st exit onto Hill Ln/B658
At the roundabout, take the 1st exit onto B658
Turn left onto The Crescent
Continue onto Mill Rd
Slight right
Continue onto Stanford Ln
Continue onto Stockbridge Rd
Continue onto Newtown
Turn left onto Langford Rd/A6001/B659
Continue to follow B659
At the roundabout, take the 2nd exit onto Cambridge Rd
Go through 1 roundabout
NB. The applicant will be responsible for taking down all Central Bedfordshire Council public notices immediately after the works requiring the Order have been completed
*Please note CBC have to advertise a route that matches the highways standards of the road to be closed. This includes weight and speed limits (so its not always a case of just showing the quickest alternative as not all vehicles can follow suit).
*Retexturing – Roads can sometimes lose their anti-skid properties due to years of use, which results in potentially dangerous road surfaces. To resolve this issue, road surface retexturing can restore roads to a safe and practical surface.
Using the right technique for retexturing roads is crucial to reduce the down-time of roads and to also make sure that no unwanted damage is inflicted to the road or surrounding areas. helping to restore roads to their former quality and improve safety for those using the road.
Restoring it back to the clean, anti-skid surface that it used to be.
This technique of road surface retexturing helps to not only improve the surface of the roads, but also cut down on any unnecessary expenditure. This is because the method of using water jets requires far less maintenance and repair work, meaning that roads can be retextured much quicker than alternative methods would be able to do.
Any white lining affected will be replaced.