CBC – Carriageway Patching and Road Markings on approach to Railway Bridge

When:
9th November 2021 – 22nd November 2021 all-day
2021-11-09T00:00:00+00:00
2021-11-23T00:00:00+00:00
Temporary Road Closure at the above location to enable Carriageway Patching works to take place safely.
The closure will take place on 9th-22nd November 0800-1800hrs
The restrictions are to be in operation only when the necessary signs are erected on site.
The Legal Order will be made to cover an 12month period. Access may be allowed from time to time according to local signing.
*Please note CBC have to advertise a route that matches the highways standards of the road to be closed. This includes weight and speed limits (so its not always a case of just showing the quickest alternative as not all vehicles can follow suit).
Diversion Route:
Head east on Edworth Rd
At the roundabout, take the 1st exit
Turn right
At the roundabout, take the 1st exit onto Biggleswade Rd
Continue onto Dunton Ln
At the roundabout, take the 1st exit onto Saxon Dr
At the roundabout, take the 3rd exit onto London Rd/A6001
At the roundabout, take the 1st exit onto St Andrew's St/B659
Go through 1 roundabout
At the roundabout, take the 2nd exit onto Hitchin St/B659
At the roundabout, take the 1st exit onto Station Rd
At the roundabout, take the 1st exit onto Cambridge Rd
Destination will be on the right

Leave a comment